OPTICAL FIBRES AND CABLES IN DEMOCRATIC REPUBLIC OF THE CONGO

Size of the bridge in Democratic Republic of Congo

Size of the bridge in Democratic Republic of Congo

The bridge will span the Congo River, measure 1,575m in length and will cost in the region of US$550 million to build. The Brazzaville–Kinshasa Bridge is a proposed road-rail bridge construction project over the Congo River. It would connect the Republic of the Congo with the Democratic Republic of the Congo at their respective capitals, Brazzaville and Kinshasa. The project estimated to cost $550m will include a toll bridge, a railway track, a road and a sidewalk, a statement cited by the Bloomberg. It's 2050 and a few months ago, our country, Congo Brazzaville, took a giant step along the path to its development and regional integration.

Read More
What are the testing cycles and standards for optical cables

What are the testing cycles and standards for optical cables

This article provides a practitioner-level walkthrough of the IEC 60794 framework: the standard's structure, the individual test methods, the distinction between type testing and routine testing, common failure modes observed in laboratory practice, and the quality infrastructure. IEC 60794 is the international standard series governing the design, construction, and performance verification of fibre optic cables. IEC 61280-4-5 provides test methods to measure the attenuation of installed multimode and single-mode optical fibre cabling plant as well as the determination of their polarity and length. Key tests include: Effective fiber testing utilizes advanced tools such as Optical Loss Test Sets (OLTS), Optical Time-Domain Reflectometers (OTDR), and Visual Fault.

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland