SPECTROMETER FOR THE METALLURGICAL INDUSTRY

Tuvalu AFS Spectrometer

Tuvalu AFS Spectrometer

In this review, the advanced and potential techniques for developing possible portable/miniaturized AFS instruments since 2000 are discussed, including radiation source, atomizer, detector and sample i.

Read More
How to connect the power supply of a spectrometer analyzer

How to connect the power supply of a spectrometer analyzer

For Go Direct spectrophotometers, do not connect the power supply, it is not needed when connecting via USB. These measurements could be done manually but automating them increases efficiency and accuracy. Instead of showing signal changes over time, as an oscilloscope does, a spectrum analyzer plots signal amplitude (vertical axis) against frequency (horizontal axis). All single-phase auxiliary wall outlets must use the same ground as the power line of the instrument. If you are measuring a current that does not exceed the maximum rated input current of the power analyzer you are working with, you can connect the current carrying cable directly to the current inputs of the power analyzer. Spectral Analysis is our free application to collect, graph, and analyze spectroscopy data from spectrometers.

Read More
Horizontal and vertical axes of the spectrometer

Horizontal and vertical axes of the spectrometer

Transmittance and absorption spectra can be measured with an ultraviolet-visible spectrophotometer. In the spectrum, the horizontal axis indicates wavelength, and the vertical axis indicates transmittance and absorbance. The slit can be moved in or out the tube by a rack and pinion arrangement using the focus knob and its width can be adjusted by turning. To align the spectrometer you will need the following pieces of equipment: Spectrometer, Bubble Level, 60Prism, Front Surface Mirror, small Allen wrench, screwdriver, Variable Intensity White{Light Source.

Read More
Drilling holes at the bottom of the tray cable tray

Drilling holes at the bottom of the tray cable tray

Drilling 1/4 inch drain holes in the bottom of the cable tray at three-foot intervals (at the middle and very near the sides) controls the spacing and supports all sizes of cables, but can not used in EMI/RFI Shielding. Structural building members should never be cut, and cable trays should not be installed in hoist way or where subject to physical. maintain spacing or to keep cables in place when the tray is ect the minimum bend ra-dius for cables as they exit the bottom of the cable tray. w!In this video, watch the complete process of installing a cable tray on site — from climbing the ladder, drilling holes, fixing raw.

Read More

Get In Touch

Connect With Us

📱

Poland (Sales & Engineering HQ)

+48 22 538 72 19

📍

Headquarters & Manufacturing

ul. Postępu 14, 02-676 Warszawa, Poland